Do You Need a Permit? Richmond Hill and Markham Renos

by Kirby Chan, Broker

Do You Need a Permit? Renovations in Richmond Hill and Markham

Most homeowners find out whether their renovation needed a permit at the worst possible moment: when they are selling and a buyer's lawyer starts asking questions. Permits are not just municipal paperwork. Unpermitted work can delay a closing, cost you money at the negotiating table and create problems with insurance and financing. This guide covers what typically needs a permit in Richmond Hill and Markham, what does not and what to do if work has already been done without one.

Written by a Richmond Hill and Markham Real Estate Expert

At Kirby Chan & Co. Real Estate Team, we ask about permits before a Richmond Hill or Markham home ever goes on the market, because it is far easier to sort out early than during a live deal. We have seen a beautifully finished basement become a negotiating problem days before closing, once it became clear the work had never been permitted. If you are renovating or selling in Richmond Hill or Markham, knowing where you stand on permits protects the value of the work you paid for.

Quick takeaway: As a general rule, work that is structural, that changes the layout or use of a space, or that involves plumbing, heating or the building envelope will need a building permit. Cosmetic work such as painting, flooring and like-for-like replacement generally does not. Electrical work is handled separately in Ontario through the Electrical Safety Authority rather than your municipal building department. Requirements and thresholds differ between Richmond Hill and Markham and change over time, so confirm with the municipality before you start. If work has already been done without a permit, deal with it before you list rather than letting a buyer's lawyer discover it.

Table of Contents

Who Issues Permits and Why They Exist

The BasicsYour Municipality, Under the Ontario Building Code

Building permits are issued by the building department of the municipality where the property sits, so a Richmond Hill home goes through the City of Richmond Hill and a Markham home through the City of Markham. Both administer the Ontario Building Code, but each has its own application process, fees, forms and interpretations, and each can differ on the finer points.

The purpose is safety and compliance. A permit means the work was reviewed against the Code and inspected at stages, so structural elements carry the loads they should, plumbing and heating are done properly and living spaces meet requirements for exits, light and ventilation. That inspection record is also what proves to a future buyer, insurer or lender that the work was done correctly.

Work That Typically Needs a Permit

General guidance only, always confirm with your municipality. Tap each to expand.

Permit LikelyStructural Changes and Additions TAP TO OPEN

Building an addition, removing or altering a load-bearing wall, changing the roof structure, underpinning or lowering a basement floor, adding or enlarging window and door openings and altering beams or posts all involve the structure of the home. This is the category where the safety stakes are highest and where an unpermitted job creates the most difficulty later. The popular open-concept renovation that takes out a wall between the kitchen and living room very often falls here.

Permit LikelyFinishing a Basement or Adding a Second Suite TAP TO OPEN

Finishing a basement generally requires a permit once you are framing new rooms, adding a bathroom, running plumbing or altering heating and ventilation. Creating a second dwelling unit, whether you call it a basement apartment, an in-law suite or a secondary suite, involves additional requirements around fire separation, exits, ceiling heights, windows and parking, and it also engages municipal zoning and registration rules.

This is one of the most common sources of trouble on a sale in Richmond Hill and Markham, because an unpermitted apartment can affect whether the space can legally be rented, how it is described in a listing and how a buyer's lender treats any rental income.

Permit LikelyPlumbing, Heating and Mechanical Changes TAP TO OPEN

Adding a bathroom, relocating plumbing fixtures, running new drains or supply lines, altering ductwork and installing or substantially changing heating and ventilation systems typically require a permit. Straight replacement of a fixture in the same location is usually treated differently from adding new plumbing where none existed, but the line between the two is exactly the sort of thing worth confirming with the building department before you begin.

Permit LikelyDecks, Garages, Sheds and Exterior Structures TAP TO OPEN

Decks above a certain height, detached garages, larger sheds and accessory structures generally require permits once they pass a size or height threshold, and pools, fences and driveway changes are often governed by their own municipal rules. The thresholds are set by the municipality and are not identical between Richmond Hill and Markham. Zoning also comes into play here through setbacks and lot coverage limits, so a structure can need approval even when it seems modest.

Work That Typically Does Not

Cosmetic and Like-for-Like Work

Painting, wallpapering, replacing flooring, installing new kitchen cabinets and countertops in the same configuration, replacing a fixture with a similar one in the same location, minor repairs and most landscaping generally do not require a building permit. A straightforward kitchen refresh that changes finishes without moving walls, plumbing or electrical is usually in this category.

The complication is that renovations rarely stay purely cosmetic. A kitchen update becomes a permit matter the moment you move the sink, relocate the range, take out a wall or add circuits. Assess the whole scope rather than the first phase.

Electrical Work Is Separate

Handled by the Electrical Safety Authority, Not the City

This catches a lot of homeowners. In Ontario, electrical work is regulated by the Electrical Safety Authority rather than your municipal building department. Electrical work generally requires notification to the ESA and inspection, and that process is separate from any building permit you may also need for the same renovation.

The document that results from a passed electrical inspection is what a buyer, lawyer or insurer may later ask to see. If you have had electrical work done, keep that paperwork with your home records. Its absence is a common gap that surfaces during a sale.

What Unpermitted Work Does to a Sale

This is where permits stop being paperwork and start costing money. Tap each to expand.

It Surfaces During the Buyer's Searches TAP TO OPEN

A buyer's lawyer conducts searches with the municipality before closing, and outstanding orders or compliance issues can come to light at that point. An inspector may also flag work that appears to have been done without proper approvals. Discovery late in a deal is the worst outcome, because you are negotiating under a deadline with your leverage gone. Our closing day guide covers how title and compliance issues can delay a closing.

It Becomes a Price Negotiation TAP TO OPEN

Once a buyer knows work was unpermitted, it becomes a reason to reduce the price, request a holdback or walk. The irony is that you generally do not get full credit for the renovation in the first place, because a buyer cannot be confident it was done properly, and then you may pay a second time in the form of a concession. Expensive work with no paperwork behind it is the worst of both outcomes.

Insurance and Financing Complications TAP TO OPEN

Insurers may take the position that a claim arising from unpermitted work is not covered, which is a real risk while you still own the home and a concern a buyer will weigh. Lenders can also be cautious where a property has known compliance issues or where an apartment that generates income turns out not to be legal. These are questions for your insurer, broker and lender directly, since positions differ.

Be Careful How the Home Is Described TAP TO OPEN

A listing should never describe a space in a way that implies approvals that do not exist. Calling an unpermitted basement a legal apartment, or presenting an unapproved addition as though it were sanctioned, creates misrepresentation risk for the seller and the brokerage both. The right approach is accurate description and, where appropriate, disclosure. Talk to your lawyer about what your disclosure obligations are in your particular situation.

If the Work Is Already Done

Step 1Find Out What Actually Exists on File

Start by finding out what permits and inspection records the municipality has for your property. This matters especially if you bought the home with the renovation already in place, since work done by a previous owner becomes your issue once you go to sell. Knowing the position early gives you time and options. Finding out during a live deal gives you neither.

Step 2Ask About Bringing It Into Compliance

It is often possible to apply for a permit after the fact and bring work into compliance, though the process depends on what was done and what the municipality requires to verify it. Inspection may require opening up finished areas so the work behind the drywall can be examined, and some work may need to be modified or redone. It is not always cheap or quick, but a resolved file is worth considerably more at sale time than an unresolved one, and it removes a risk you would otherwise carry.

Step 3Deal With It Before You List, Not During the Deal

Whatever you decide, decide it before the home goes on the market. If the issue can be resolved, resolve it and keep the paperwork. If it cannot be resolved in your timeframe, get legal advice on how the property should be described and what should be disclosed, and price the home with the issue accounted for. Handled up front, it is a known factor. Discovered at the eleventh hour, it becomes leverage against you. Our complete selling guide covers the rest of the pre-listing preparation.

Before You Start a Renovation

Three Habits That Prevent All of This

Call the building department first. A single call to Richmond Hill or Markham describing your planned scope will tell you what is required. It costs nothing and takes minutes.

Be cautious with contractors who dismiss permits. A contractor who says a permit is unnecessary for structural, plumbing or suite work may be right, but it is your property that carries the consequence, not theirs. Verify independently.

Keep every document. Permits, inspection records, electrical certificates, contractor invoices and warranties belong in one file. When you sell, that file is what turns a renovation into demonstrable value rather than a question mark.

Recognition

Kirby Chan Awards and Achievements

🏆 #1 Individual Producer in Ontario for eXp Realty 2023

🏆 Top 3 Best Rated Real Estate Agent in Richmond Hill

🏆 Toronto Star Platinum Award for Best Real Estate Agent

🏆 Top Real Estate Agent Award in Markham

🏆 2X ICON Agent Award with eXp Realty

🏆 2025 Community Votes Platinum Award, Thornhill

🏆 2024 Community Votes Platinum Award, Thornhill

🏆 2025 Gold Award for Real Estate Brokers in Markham

🏆 2024 Community Votes Bronze Award, Richmond Hill

🏆 2023 Community Votes Platinum Award, Thornhill

Frequently Asked Questions

Tap a question to expand the answer.

Do I need a permit to finish my basement?

Generally yes, once you are framing new rooms, adding a bathroom, running plumbing or altering heating and ventilation. Creating a separate dwelling unit adds further requirements and engages zoning rules. Confirm the specifics with Richmond Hill or Markham before starting.

Do I need a permit to remove a wall?

If the wall is load-bearing or the work affects the structure, a permit is generally required. Because it is not always obvious which walls are structural, this is worth confirming before demolition rather than after.

Does painting or new flooring need a permit?

Generally no. Painting, flooring, cabinet replacement in the same configuration and like-for-like fixture swaps are usually cosmetic. The moment the project involves moving walls, plumbing or electrical, the answer can change.

Is electrical work covered by a building permit?

No. In Ontario electrical work is regulated by the Electrical Safety Authority and generally requires notification and inspection through the ESA, separately from any municipal building permit the same project may need.

Can I sell a home with unpermitted work?

It is often possible, but it can affect price, financing, insurance and the closing itself, and the property must be described accurately. Deal with it before listing and get legal advice about disclosure rather than hoping it goes unnoticed.

Who can advise me on permits before selling in Richmond Hill or Markham?

Kirby Chan and the Kirby Chan & Co. Real Estate Team raise permit questions during the pre-listing walkthrough so anything outstanding can be addressed before the home goes to market rather than during a live deal. Reach me at (416) 305-8008.

Contact Kirby Chan

Renovating or Selling in Richmond Hill or Markham?

Permit questions are far cheaper to answer before you list than during a closing. I raise them in the pre-listing walkthrough, along with everything else that could surface in a buyer's searches, so your renovation shows up as value rather than as a question mark.

Book a consultation with me for a pre-listing review and a market evaluation for your home.

Kirby Chan | Kirby Chan & Co. Real Estate Team
416-305-8008
kirby@kirbychanandco.com
https://kirbychanandco.com

Note: Permit requirements, exemptions, size thresholds, fees and zoning rules are set by each municipality and by the Ontario Building Code, differ between Richmond Hill and Markham and change over time. The examples in this guide are general and not a determination of what your specific project requires. Always confirm requirements directly with the building department of the municipality where the property is located before beginning work, and consult a lawyer regarding disclosure obligations or any compliance issue affecting a sale. This guide is for general information only and does not constitute legal or construction advice.

Kirby Chan, Broker

Kirby Chan, Broker

Co-Founder & Broker | License ID: 9533841

+1(416) 305-8008

GET MORE INFORMATION

Name
Phone*
Message
};